Title : U.S. Navy's Second Zumwalt Destroyer Needs New Engine After Turbine Blades Get Damaged During Sea Trials
link : U.S. Navy's Second Zumwalt Destroyer Needs New Engine After Turbine Blades Get Damaged During Sea Trials
U.S. Navy's Second Zumwalt Destroyer Needs New Engine After Turbine Blades Get Damaged During Sea Trials
The Navy's next generation destroyer, the future USS Michael Monsoor (DDG 1001), successfully completed acceptance. (U.S. Navy photo courtesy of Bath Iron Works)
USNI News: Second Zumwalt Destroyer Needs New Engine After Turbine Blades Damaged in Sea Trials
Zumwalt-class destroyer Michael Monsoor (DDG-1001) will need to have a main turbine engine replaced before the ship can sail to San Diego for its combat system activation, after suffering damage to the turbine blades during acceptance trials, the Program Executive Officer for Ships told USNI News.
Rear Adm. William Galinis said today that Monsoor remained in Bath, Maine, for a post-delivery availability and that, “regrettably, coming off her acceptance trials we found a problem with one of the main turbine engines that drives one of the main generators; we’re having to change it out. So we’re working very closely with Bath Iron Works, with Rolls-Royce to get that engine changed out before she leaves Bath later this fall and sails to San Diego to start her combat system activation availability next year.”
After his remarks at a Navy League breakfast event, Galinis told USNI News that the MT30 marine gas turbine showed no signs of malfunctioning during the sea trials, but the damage was found in a post-trials inspection.
Read more ....
WNU Editor: An expensive repair bill.
More News On the U.S. Navy's Second Zumwalt Destroyer Needing A New Engine After Turbine Blades Get Damaged During Sea Trials
U.S. Navy's 2nd Zumwalt-Class Guided-Missile Destroyer Suffers Damage During Sea Trials -- The Diplomat
Report: Stealth Destroyer Returns to Shipyard with Wrecked Engine -- Military.com/Bangor Daily News, Maine
BIW-built stealth destroyer needs $20 million engine replaced -- Press Herald
US’ Embattled Zumwalt Destroyer Requires $20 Million Engine Replacement -- Sputnik
Thus Article U.S. Navy's Second Zumwalt Destroyer Needs New Engine After Turbine Blades Get Damaged During Sea Trials
That's an article U.S. Navy's Second Zumwalt Destroyer Needs New Engine After Turbine Blades Get Damaged During Sea Trials This time, hopefully can give benefits to all of you. well, see you in posting other articles.
You are now reading the article U.S. Navy's Second Zumwalt Destroyer Needs New Engine After Turbine Blades Get Damaged During Sea Trials with the link address https://infotodays1.blogspot.com/2018/07/us-navys-second-zumwalt-destroyer-needs.html
0 Response to "U.S. Navy's Second Zumwalt Destroyer Needs New Engine After Turbine Blades Get Damaged During Sea Trials"
Post a Comment